Triple

T23908777
Position Surface form Disambiguated ID Type / Status
Subject ITER project E601277 entity
Predicate instanceOf P0 FINISHED
Object nuclear fusion research project C4813 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear fusion research project
Context triple: [ITER project, instanceOf, nuclear fusion research project]
  • A. nuclear reactor project
    A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
  • B. fusion energy research facility chosen
    A fusion energy research facility is a specialized scientific complex where researchers design, build, and operate advanced experimental systems to achieve and study controlled nuclear fusion as a potential source of large-scale, low-carbon power.
  • C. nuclear research funding programme
    A nuclear research funding programme is an organized initiative that allocates financial and institutional resources to support scientific, technological, and safety-related research in the field of nuclear energy and radiation applications.
  • D. nuclear physics experiment program
    A nuclear physics experiment program is a coordinated set of experiments, instrumentation, data acquisition, and analysis activities designed to investigate the properties, interactions, and structure of atomic nuclei under controlled laboratory conditions.
  • E. nuclear physics experiment
    A nuclear physics experiment is a controlled scientific investigation that probes the properties, interactions, and structure of atomic nuclei using particle beams, detectors, and specialized instrumentation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e295364a488190bcac702e9bb7f764 completed April 17, 2026, 8:16 p.m.
Created at: April 17, 2026, 8:37 p.m.