Triple

T23901124
Position Surface form Disambiguated ID Type / Status
Subject North Lock E601044 entity
Predicate instanceOf P0 FINISHED
Object sea lock C48188 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: sea lock
Context triple: [North Lock, instanceOf, sea lock]
  • A. sea gate
    A sea gate is a fortified maritime passage or barrier that controls access between bodies of water, often used for defense, navigation, or flood protection.
  • B. dock lock
    A dock lock is a security mechanism designed to secure boats or watercraft to a dock, preventing unauthorized removal or theft.
  • C. sea fort
    A sea fort is a fortified structure built on or near the sea, typically on artificial islands, rocks, or coastal waters, designed to defend harbors, coastlines, or strategic maritime routes.
  • D. seawall
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • E. seaport
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e295364a488190bcac702e9bb7f764 completed April 17, 2026, 8:16 p.m.
Created at: April 17, 2026, 8:26 p.m.