Triple
T2382789
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New York State Thruway |
E46348
|
entity |
| Predicate | abbreviation |
P43
|
FINISHED |
| Object | Thruway |
E46348
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Thruway | Statement: [New York State Thruway, abbreviation, Thruway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Thruway Context triple: [New York State Thruway, abbreviation, Thruway]
-
A.
New York State Thruway
chosen
The New York State Thruway is a major toll highway system spanning much of New York State, serving as a key corridor for regional and interstate travel.
-
B.
E.C. Row Expressway
The E.C. Row Expressway is a major east–west freeway in Windsor, Ontario, serving as a primary urban arterial route across the city.
-
C.
Nassau Expressway
Nassau Expressway is a major roadway in the New York metropolitan area that links parts of Long Island to John F. Kennedy International Airport and other key regional highways.
-
D.
Northern Expressway
Northern Expressway is a major segment of Interstate 93 in the northeastern United States, serving as a key highway corridor through the Boston metropolitan area.
-
E.
Pennsylvania Turnpike
The Pennsylvania Turnpike is a major toll highway system running across Pennsylvania, serving as a key east–west transportation corridor in the northeastern United States.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88a1554a48190a0180682bcf099be |
completed | March 4, 2026, 7:37 p.m. |
| NER | Named-entity recognition | batch_69abc7bafa248190a68e8f1e081f4817 |
completed | March 7, 2026, 6:37 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69aea8b790bc8190ba399e252acec750 |
completed | March 9, 2026, 11:02 a.m. |
Created at: March 4, 2026, 7:57 p.m.