Triple

T237817
Position Surface form Disambiguated ID Type / Status
Subject ASME B31 Pressure Piping Code E4859 entity
Predicate updateCycle P7825 FINISHED
Object periodically revised LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: periodically revised | Statement: [ASME B31 Pressure Piping Code, updateCycle, periodically revised]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: updateCycle
Context triple: [ASME B31 Pressure Piping Code, updateCycle, periodically revised]
  • A. updateProcess
    Indicates the action or procedure by which an existing item, system, or state is modified to a newer or revised version.
  • B. updated
    Indicates that an entity has been modified or brought to a more recent state compared to its previous version or status.
  • C. readingsCycle chosen
    Indicates that there is a recurring or cyclical pattern in the readings associated with an entity or process.
  • D. followsCycle
    Indicates that one entity adheres to or repeats a recurring sequence, pattern, or cycle defined or exemplified by another entity.
  • E. upgradePhase
    Indicates the stage or step within a process where an entity is being upgraded or transitioned to a more advanced version or state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a257c3d0708190b0871c4269d273e6 completed Feb. 28, 2026, 2:49 a.m.
NER Named-entity recognition batch_69a25dacf60c8190a5c3ef455b9a8b20 completed Feb. 28, 2026, 3:14 a.m.
PD Predicate disambiguation batch_69a25b5f27208190ae13f34037fe582b completed Feb. 28, 2026, 3:05 a.m.
Created at: Feb. 28, 2026, 2:53 a.m.