Triple

T23736981
Position Surface form Disambiguated ID Type / Status
Subject Ranging and Integrity Monitoring Stations E586565 entity
Predicate instanceOf P0 FINISHED
Object ground-based facility C17219 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ground-based facility
Context triple: [Ranging and Integrity Monitoring Stations, instanceOf, ground-based facility]
  • A. ground tracking facility
    A ground tracking facility is a terrestrial station equipped with antennas, sensors, and communication systems used to monitor, communicate with, and control spacecraft or other remote vehicles.
  • B. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • C. surface station chosen
    A surface station is a ground-based facility equipped with instruments and systems to monitor, control, or communicate with external environments or assets such as weather, spacecraft, or remote sensors.
  • D. ground-based radar system
    A ground-based radar system is a terrestrial installation that emits radio waves and analyzes their reflections to detect, track, and characterize objects or weather phenomena within its coverage area.
  • E. testing facility
    A testing facility is a specialized environment equipped with tools, equipment, and procedures designed to systematically evaluate, measure, and validate the performance, safety, or quality of products, systems, or processes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24907dc9c8190be074c9c96a0ec2d completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 7:10 p.m.