Triple

T23708172
Position Surface form Disambiguated ID Type / Status
Subject Vantage Airport Group E585786 entity
Predicate instanceOf P0 FINISHED
Object infrastructure development company C2979 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure development company
Context triple: [Vantage Airport Group, instanceOf, infrastructure development company]
  • A. infrastructure developer
    An infrastructure developer designs, builds, and maintains the underlying systems, tools, and automation that support reliable, scalable, and secure software deployment and operations.
  • B. infrastructure finance company
    An infrastructure finance company is a financial institution that provides long-term funding, credit support, and advisory services for the development, operation, and maintenance of large-scale public and private infrastructure projects.
  • C. infrastructure management company chosen
    An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
  • D. sustainable urban development company
    A sustainable urban development company plans, designs, and builds city spaces and infrastructure that minimize environmental impact, promote social equity, and support long-term economic resilience.
  • E. construction and trading company
    A construction and trading company is a business entity that both executes building and infrastructure projects and engages in the procurement, sale, and distribution of construction-related materials, equipment, or goods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24905f77881908194d645676acd60 completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 6:53 p.m.