Triple
T23708172
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vantage Airport Group |
E585786
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure development company |
C2979
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure development company Context triple: [Vantage Airport Group, instanceOf, infrastructure development company]
-
A.
infrastructure developer
An infrastructure developer designs, builds, and maintains the underlying systems, tools, and automation that support reliable, scalable, and secure software deployment and operations.
-
B.
infrastructure finance company
An infrastructure finance company is a financial institution that provides long-term funding, credit support, and advisory services for the development, operation, and maintenance of large-scale public and private infrastructure projects.
-
C.
infrastructure management company
chosen
An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
-
D.
sustainable urban development company
A sustainable urban development company plans, designs, and builds city spaces and infrastructure that minimize environmental impact, promote social equity, and support long-term economic resilience.
-
E.
construction and trading company
A construction and trading company is a business entity that both executes building and infrastructure projects and engages in the procurement, sale, and distribution of construction-related materials, equipment, or goods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24905f77881908194d645676acd60 |
completed | April 17, 2026, 2:51 p.m. |
Created at: April 17, 2026, 6:53 p.m.