Triple

T23693373
Position Surface form Disambiguated ID Type / Status
Subject 옥류교 E585365 entity
Predicate instanceOf P0 FINISHED
Object 교량 C47958 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 교량
Context triple: [옥류교, instanceOf, 교량]
  • A. river bridge
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • B. разводной мост
    Разводной мост — это мостовая конструкция с подвижными пролетами, которые могут подниматься или раздвигаться для пропуска судов по водному пути.
  • C. dam bridge
    A dam bridge is a structure that combines the functions of a dam for water retention and control with a bridge that provides a transportation route across the impounded water or river.
  • D. tram bridge
    A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
  • E. cross-sea bridge
    A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e249037ce0819088b149608e98f685 completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 6:52 p.m.