Triple

T2361375
Position Surface form Disambiguated ID Type / Status
Subject Bluegrass Parkway E47278 entity
Predicate partOf P40 FINISHED
Object Kentucky highway system E47023 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kentucky highway system | Statement: [Bluegrass Parkway, partOf, Kentucky highway system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kentucky highway system
Context triple: [Bluegrass Parkway, partOf, Kentucky highway system]
  • A. Kentucky state highway system chosen
    The Kentucky state highway system is the network of numbered state-maintained roads that connect cities, towns, and rural areas throughout the Commonwealth of Kentucky.
  • B. Kentucky Route 1500
    Kentucky Route 1500 is a state highway in Kentucky that serves the Vine Grove area, providing local connectivity within Hardin County.
  • C. Kentucky Route 313
    Kentucky Route 313 is a state highway in Kentucky that serves as a regional connector through parts of central Kentucky, including Meade County.
  • D. Kentucky Route 144
    Kentucky Route 144 is a state highway in Kentucky that serves as a regional connector through communities such as Vine Grove.
  • E. Kentucky Route 79
    Kentucky Route 79 is a state highway in Kentucky that runs generally north–south, connecting several communities between the Ohio River area and central parts of the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a1a4a6081908645b0f2914521ab completed March 4, 2026, 7:38 p.m.
NER Named-entity recognition batch_69abc723c66481908a9b94991f651b3b completed March 7, 2026, 6:35 a.m.
NED1 Entity disambiguation (via context triple) batch_69aea88cf3308190bdb5aac38aded823 completed March 9, 2026, 11:01 a.m.
Created at: March 4, 2026, 7:55 p.m.