Triple
T23577504
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Maritime Link |
E580300
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | subsea power interconnector |
C37323
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: subsea power interconnector Context triple: [Maritime Link, instanceOf, subsea power interconnector]
-
A.
HVDC interconnector
An HVDC interconnector is a high-voltage direct current transmission link that connects separate power grids or regions to enable efficient long-distance electricity transfer and cross-border energy exchange.
-
B.
electricity interconnector
chosen
An electricity interconnector is a high-capacity transmission link that connects the power grids of different regions or countries, enabling cross-border exchange of electrical energy.
-
C.
submarine telegraph cable network
A submarine telegraph cable network is an interconnected system of undersea cables and shore stations designed to transmit telegraphic signals across oceans and seas between distant locations.
-
D.
subsea systems developer
A subsea systems developer designs, integrates, and maintains underwater technologies and infrastructure for offshore energy, research, and communication applications.
-
E.
submarine channel
A submarine channel is an underwater valley-like feature on the seafloor formed by sediment-laden currents that transport and deposit sediments across continental margins and deep ocean basins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24601a9108190bc31e83833c980e4 |
completed | April 17, 2026, 2:38 p.m. |
Created at: April 17, 2026, 6:38 p.m.