Triple
T23577503
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Maritime Link |
E580300
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-voltage direct current transmission system |
C37324
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-voltage direct current transmission system Context triple: [Maritime Link, instanceOf, high-voltage direct current transmission system]
-
A.
HVDC interconnector
chosen
An HVDC interconnector is a high-voltage direct current transmission link that connects separate power grids or regions to enable efficient long-distance electricity transfer and cross-border energy exchange.
-
B.
high-power DC fast charging system
A high-power DC fast charging system is an electrical infrastructure that delivers large amounts of direct current at high voltage and current levels to rapidly recharge electric vehicle batteries, typically reducing charging times to minutes instead of hours.
-
C.
electricity interconnector
An electricity interconnector is a high-capacity transmission link that connects the power grids of different regions or countries, enabling cross-border exchange of electrical energy.
-
D.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
E.
national grid system
A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24601a9108190bc31e83833c980e4 |
completed | April 17, 2026, 2:38 p.m. |
Created at: April 17, 2026, 6:38 p.m.