Triple

T23577503
Position Surface form Disambiguated ID Type / Status
Subject Maritime Link E580300 entity
Predicate instanceOf P0 FINISHED
Object high-voltage direct current transmission system C37324 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-voltage direct current transmission system
Context triple: [Maritime Link, instanceOf, high-voltage direct current transmission system]
  • A. HVDC interconnector chosen
    An HVDC interconnector is a high-voltage direct current transmission link that connects separate power grids or regions to enable efficient long-distance electricity transfer and cross-border energy exchange.
  • B. high-power DC fast charging system
    A high-power DC fast charging system is an electrical infrastructure that delivers large amounts of direct current at high voltage and current levels to rapidly recharge electric vehicle batteries, typically reducing charging times to minutes instead of hours.
  • C. electricity interconnector
    An electricity interconnector is a high-capacity transmission link that connects the power grids of different regions or countries, enabling cross-border exchange of electrical energy.
  • D. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • E. national grid system
    A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24601a9108190bc31e83833c980e4 completed April 17, 2026, 2:38 p.m.
Created at: April 17, 2026, 6:38 p.m.