Triple
T23577460
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Labrador–Island Link |
E580299
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electric power transmission system |
C7916
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electric power transmission system Context triple: [Labrador–Island Link, instanceOf, electric power transmission system]
-
A.
power system
chosen
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
national grid system
A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
-
C.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
D.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
E.
electric transport system
An electric transport system is an integrated network of vehicles, infrastructure, and control technologies that enables the movement of people or goods using electricity as the primary energy source.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24601a9108190bc31e83833c980e4 |
completed | April 17, 2026, 2:38 p.m. |
Created at: April 17, 2026, 6:38 p.m.