Triple

T23560912
Position Surface form Disambiguated ID Type / Status
Subject The Jim Henson Hour E579232 entity
Predicate shortRunStatus P39416 FINISHED
Object cancelled after low ratings LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: cancelled after low ratings | Statement: [The Jim Henson Hour, shortRunStatus, cancelled after low ratings]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: shortRunStatus
Context triple: [The Jim Henson Hour, shortRunStatus, cancelled after low ratings]
  • A. hasShortRun
    Indicates that an entity has a brief or limited-duration run or operational period.
  • B. originalRunStatus chosen
    Indicates the initial or prior execution state of a run before any subsequent updates or changes.
  • C. runtimeStatus
    Indicates the current operational state or condition of an entity while it is running or executing.
  • D. shortFormat
    Indicates that something is presented in a condensed or abbreviated form compared to its full or standard representation.
  • E. typicalRuntimePerShort
    Indicates the usual or average amount of time it takes to complete a short instance of the referenced activity or process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245fe24588190888f3aec8407d8e3 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f1af680ee88190a23a6f9fed7ae757 completed April 29, 2026, 7:12 a.m.
PD Predicate disambiguation batch_69f118afabd88190bd88f49597d120e8 completed April 28, 2026, 8:29 p.m.
Created at: April 17, 2026, 6:16 p.m.