Triple

T23548820
Position Surface form Disambiguated ID Type / Status
Subject Wangaratta E577979 entity
Predicate roadConnectionTo P9041 FINISHED
Object Sydney (via Hume Highway corridor) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sydney (via Hume Highway corridor) | Statement: [Wangaratta, roadConnectionTo, Sydney (via Hume Highway corridor)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sydney (via Hume Highway corridor)
Context triple: [Wangaratta, roadConnectionTo, Sydney (via Hume Highway corridor)]
  • A. Sydney–Tumut coach corridor
    The Sydney–Tumut coach corridor is a regional long-distance coach route in New South Wales, Australia, linking Sydney with the inland town of Tumut as part of the state’s public transport network.
  • B. A6 corridor in Sydney
    The A6 corridor in Sydney is a major north–south arterial route in the city's western suburbs, linking key roads and crossings such as the Alfords Point Bridge to facilitate regional traffic flow.
  • C. Pacific Highway outside Sydney
    The Pacific Highway outside Sydney is a major coastal road in New South Wales that links Sydney with numerous regional towns and cities along Australia’s east coast.
  • D. Sydney–Bombala coach corridor
    The Sydney–Bombala coach corridor is a regional long-distance bus route in New South Wales, Australia, linking Sydney with the town of Bombala and intermediate communities.
  • E. Sydney–Armidale coach corridor
    The Sydney–Armidale coach corridor is a long-distance regional coach route in New South Wales, Australia, linking Sydney with the inland city of Armidale as part of the state’s public transport network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sydney (via Hume Highway corridor)
Target entity description: Sydney (via Hume Highway corridor) is Australia’s largest city and the primary eastern terminus of the Hume Highway, a major interstate route linking it with inland regional centres such as Wangaratta and Melbourne.
  • A. Sydney–Tumut coach corridor
    The Sydney–Tumut coach corridor is a regional long-distance coach route in New South Wales, Australia, linking Sydney with the inland town of Tumut as part of the state’s public transport network.
  • B. A6 corridor in Sydney
    The A6 corridor in Sydney is a major north–south arterial route in the city's western suburbs, linking key roads and crossings such as the Alfords Point Bridge to facilitate regional traffic flow.
  • C. Pacific Highway outside Sydney
    The Pacific Highway outside Sydney is a major coastal road in New South Wales that links Sydney with numerous regional towns and cities along Australia’s east coast.
  • D. Sydney–Bombala coach corridor
    The Sydney–Bombala coach corridor is a regional long-distance bus route in New South Wales, Australia, linking Sydney with the town of Bombala and intermediate communities.
  • E. Sydney–Armidale coach corridor
    The Sydney–Armidale coach corridor is a long-distance regional coach route in New South Wales, Australia, linking Sydney with the inland city of Armidale as part of the state’s public transport network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245fa93448190919cb04534560542 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f1aecd60a881908c257d9ba67080c8 completed April 29, 2026, 7:10 a.m.
Created at: April 17, 2026, 6:11 p.m.