Triple

T23541889
Position Surface form Disambiguated ID Type / Status
Subject Holyoke Water Power Company gatehouses E577774 entity
Predicate instanceOf P0 FINISHED
Object water control structures C5154 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water control structures
Context triple: [Holyoke Water Power Company gatehouses, instanceOf, water control structures]
  • A. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • B. water management structure chosen
    A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
  • C. lock and dam structure
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • D. water infrastructure
    Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
  • E. levee system
    A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245f9d5d08190a4a20004e1784e20 completed April 17, 2026, 2:38 p.m.
Created at: April 17, 2026, 6:10 p.m.