Triple

T23516608
Position Surface form Disambiguated ID Type / Status
Subject Production units of Indian Railways E574385 entity
Predicate instanceOf P0 FINISHED
Object railway production system C6407 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway production system
Context triple: [Production units of Indian Railways, instanceOf, railway production system]
  • A. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • B. industrial production system
    An industrial production system is an organized arrangement of people, machines, materials, methods, and information designed to efficiently transform inputs into standardized goods or services at scale.
  • C. industrial railway
    An industrial railway is a specialized rail system used within or between industrial facilities to transport raw materials, goods, and equipment efficiently as part of production and logistics operations.
  • D. railway engineering complex
    A railway engineering complex is an integrated facility where railway infrastructure, rolling stock, and related systems are designed, constructed, tested, maintained, and managed.
  • E. rail transport manufacturer chosen
    A rail transport manufacturer is a company that designs, engineers, and produces railway vehicles and related equipment such as locomotives, passenger cars, freight wagons, and signaling systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245bb3dcc8190ba9a2b35972b58d0 completed April 17, 2026, 2:37 p.m.
Created at: April 17, 2026, 6:08 p.m.