Triple

T234995
Position Surface form Disambiguated ID Type / Status
Subject Osaka Castle E4489 entity
Predicate instanceOf P0 FINISHED
Object Japanese castle C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Japanese castle
Context triple: [Osaka Castle, instanceOf, Japanese castle]
  • A. military fortification system
    A military fortification system is an integrated network of defensive structures, obstacles, and support facilities designed to protect territory, forces, and strategic assets from enemy attack.
  • B. line of fortifications
    A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
  • C. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • D. lattice tower
    A lattice tower is a tall, open-framework structure made of intersecting metal or wooden members, designed to support loads such as antennas, power lines, or observation platforms.
  • E. ceremonial bridge
    A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a257363ffc81909757bde7ab3404da completed Feb. 28, 2026, 2:47 a.m.
Created at: Feb. 28, 2026, 2:53 a.m.