Triple

T23490528
Position Surface form Disambiguated ID Type / Status
Subject The Allen E570657 entity
Predicate runsAdjacentTo P27125 FINISHED
Object Line 1 Yonge–University NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 1 Yonge–University | Statement: [The Allen, runsAdjacentTo, Line 1 Yonge–University]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Line 1 Yonge–University
Context triple: [The Allen, runsAdjacentTo, Line 1 Yonge–University]
  • A. Line 1 Yonge–University chosen
    Line 1 Yonge–University is the busiest and oldest subway line in Toronto’s transit system, forming a U-shaped route through the city’s downtown core and major north–south corridors.
  • B. TTC Line 4 Sheppard
    TTC Line 4 Sheppard is a short east–west subway line in Toronto’s rapid transit network, running under Sheppard Avenue East and connecting several North York neighborhoods to the broader TTC system.
  • C. Line 2 Bloor–Danforth
    Line 2 Bloor–Danforth is a major east–west subway line in Toronto’s rapid transit system, running primarily along Bloor Street and Danforth Avenue.
  • D. Ontario Line
    The Ontario Line is a planned rapid transit line in Toronto, Canada, intended to relieve congestion on existing subway routes and improve connectivity across the city.
  • E. Spadina subway line
    The Spadina subway line is a major Toronto Transit Commission rapid transit route running north–south through the city’s west side, serving key residential, commercial, and institutional areas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: runsAdjacentTo
Context triple: [The Allen, runsAdjacentTo, Line 1 Yonge–University]
  • A. isAdjacentTo
    Indicates that one entity is directly next to or bordering another without anything of the same type in between.
  • B. neighboringTo
    Indicates that one entity is located directly adjacent or very close to another entity, sharing a common boundary or immediate vicinity.
  • C. locatedInOrAdjacentTo
    Indicates that one entity is either situated within the boundaries of another entity or directly next to it, sharing a common border or edge.
  • D. runsThroughNeighborhood chosen
    Indicates that something (such as a route, path, or service) passes through or traverses a particular neighborhood.
  • E. runsAcross
    Indicates that one entity moves quickly on foot from one side of another entity, area, or boundary to the opposite side, traversing it in a roughly straight path.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b0b01481908f636939bedd804c completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1a7dba7388190a322ab059bb6522a completed April 29, 2026, 6:40 a.m.
PD Predicate disambiguation batch_69f0620ac3608190b36916261ea50f54 completed April 28, 2026, 7:30 a.m.
Created at: April 17, 2026, 6:04 p.m.