Triple
T23487015
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | DSS-25 |
E570561
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | NASA ground station asset |
C19969
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: NASA ground station asset Context triple: [DSS-25, instanceOf, NASA ground station asset]
-
A.
NASA ground support equipment
NASA ground support equipment comprises the specialized tools, structures, and systems used on the ground to assemble, test, transport, service, and launch spacecraft and launch vehicles safely and reliably.
-
B.
ground tracking facility
A ground tracking facility is a terrestrial station equipped with antennas, sensors, and communication systems used to monitor, communicate with, and control spacecraft or other remote vehicles.
-
C.
deep space communications facility
chosen
A deep space communications facility is a ground-based complex equipped with large antennas, high-power transmitters, and sensitive receivers used to send commands to and receive data from spacecraft operating far beyond Earth's orbit.
-
D.
NASA spaceport
A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
-
E.
NASA center
A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245b0b01481908f636939bedd804c |
completed | April 17, 2026, 2:37 p.m. |
Created at: April 17, 2026, 6:04 p.m.