Triple
T23461821
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nauta |
E568998
|
entity |
| Predicate | roadConnection |
P385
|
FINISHED |
| Object | Iquitos–Nauta highway |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Iquitos–Nauta highway | Statement: [Nauta, roadConnection, Iquitos–Nauta highway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Iquitos–Nauta highway Context triple: [Nauta, roadConnection, Iquitos–Nauta highway]
-
A.
Arequipa–Juliaca highway
The Arequipa–Juliaca highway is a major road in southern Peru that connects the city of Arequipa with Juliaca across the Andean highlands.
-
B.
BR-230 (Trans-Amazonian Highway)
BR-230, known as the Trans-Amazonian Highway, is a major Brazilian road that crosses the Amazon region, built to promote settlement and economic development in the country’s interior.
-
C.
La Paz–Puno route
The La Paz–Puno route is a key international transport corridor linking Bolivia’s administrative capital La Paz with the Peruvian city of Puno on Lake Titicaca, facilitating cross-border travel and trade.
-
D.
Fernando Belaúnde Terry Highway
The Fernando Belaúnde Terry Highway is a major Peruvian roadway that links the Amazonian interior with the Andean and coastal regions, serving as a key route for transportation and regional integration.
-
E.
Bolivia–Peru road corridor
The Bolivia–Peru road corridor is a key international highway route that facilitates cross-border trade and travel between Bolivia and Peru, particularly through the Lake Titicaca region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Iquitos–Nauta highway Target entity description: The Iquitos–Nauta highway is a key road in the Peruvian Amazon that links the river city of Iquitos to the town of Nauta, providing one of the region’s few overland transportation routes.
-
A.
Arequipa–Juliaca highway
The Arequipa–Juliaca highway is a major road in southern Peru that connects the city of Arequipa with Juliaca across the Andean highlands.
-
B.
BR-230 (Trans-Amazonian Highway)
BR-230, known as the Trans-Amazonian Highway, is a major Brazilian road that crosses the Amazon region, built to promote settlement and economic development in the country’s interior.
-
C.
La Paz–Puno route
The La Paz–Puno route is a key international transport corridor linking Bolivia’s administrative capital La Paz with the Peruvian city of Puno on Lake Titicaca, facilitating cross-border travel and trade.
-
D.
Fernando Belaúnde Terry Highway
The Fernando Belaúnde Terry Highway is a major Peruvian roadway that links the Amazonian interior with the Andean and coastal regions, serving as a key route for transportation and regional integration.
-
E.
Bolivia–Peru road corridor
The Bolivia–Peru road corridor is a key international highway route that facilitates cross-border trade and travel between Bolivia and Peru, particularly through the Lake Titicaca region.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458ebd808190b3298163132cfb0b |
completed | April 17, 2026, 2:37 p.m. |
| NER | Named-entity recognition | batch_69f1a69bc200819096ed2baf25cdee4f |
completed | April 29, 2026, 6:35 a.m. |
Created at: April 17, 2026, 5:54 p.m.