Triple

T23447175
Position Surface form Disambiguated ID Type / Status
Subject Northern State, Sudan E565568 entity
Predicate hasInfrastructure P2560 FINISHED
Object Merowe Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Merowe Dam | Statement: [Northern State, Sudan, hasInfrastructure, Merowe Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Merowe Dam
Context triple: [Northern State, Sudan, hasInfrastructure, Merowe Dam]
  • A. Merowe Dam chosen
    Merowe Dam is a large hydroelectric dam on the Nile River in northern Sudan, known for its significant power generation capacity and its controversial social and environmental impacts.
  • B. Khashm el-Girba Dam
    Khashm el-Girba Dam is a major embankment dam in eastern Sudan that provides irrigation water, hydroelectric power, and flood control along the Atbara River.
  • C. Sennar Dam
    Sennar Dam is a major early-20th-century irrigation and hydroelectric dam on the Blue Nile in Sudan, crucial for agricultural development in the Gezira region.
  • D. Fedaia Dam
    Fedaia Dam is a hydroelectric dam and reservoir in the Dolomites of northern Italy, situated beneath the Marmolada massif.
  • E. Qaraoun Dam
    Qaraoun Dam is a major concrete dam in Lebanon that creates Lake Qaraoun, serving as a key source of hydroelectric power, irrigation, and water storage for the Litani River basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24584f9488190bb32730bd2ce023e completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f1a649f7e8819080aeb120afd57aad completed April 29, 2026, 6:33 a.m.
Created at: April 17, 2026, 5:51 p.m.