Triple
T23442129
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Titan IIIA |
E565431
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | American rocket |
C10439
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: American rocket Context triple: [Titan IIIA, instanceOf, American rocket]
-
A.
NASA rocket engine test facility
A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
-
B.
military rocket
A military rocket is a self-propelled, unguided or guided weapon system that uses rocket propulsion to deliver explosive or specialized payloads to a target for combat or strategic purposes.
-
C.
air-launched rocket
An air-launched rocket is a launch vehicle that is carried to high altitude by an aircraft before being released and ignited to deliver payloads into space or high-speed trajectories.
-
D.
prototype rocket
chosen
A prototype rocket is an experimental launch vehicle built to test and validate new propulsion, structural, and control technologies before full-scale production or operational deployment.
-
E.
Saturn V mobile launcher
The Saturn V mobile launcher was a massive, self-contained launch platform and service structure that transported, supported, and provided umbilical connections to the Saturn V rocket from assembly to liftoff.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24584f9488190bb32730bd2ce023e |
completed | April 17, 2026, 2:36 p.m. |
Created at: April 17, 2026, 5:51 p.m.