Triple
T23412982
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jiaozhou Bay |
E560127
|
entity |
| Predicate | hasNearbyInfrastructure |
P231
|
FINISHED |
| Object | Qingdao Jiaozhou Bay Tunnel |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Qingdao Jiaozhou Bay Tunnel | Statement: [Jiaozhou Bay, hasNearbyInfrastructure, Qingdao Jiaozhou Bay Tunnel]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Qingdao Jiaozhou Bay Tunnel Context triple: [Jiaozhou Bay, hasNearbyInfrastructure, Qingdao Jiaozhou Bay Tunnel]
-
A.
Jiaozhou Bay Bridge
Jiaozhou Bay Bridge is a long sea-crossing bridge in eastern China that carries traffic across Jiaozhou Bay near Qingdao.
-
B.
Pingtan Strait Road-Rail Bridge
The Pingtan Strait Road-Rail Bridge is a major sea-crossing bridge in Fujian, China, carrying both highway and railway lines to connect Pingtan Island with the mainland.
-
C.
Hangzhou Bay Bridge
The Hangzhou Bay Bridge is a long trans-oceanic highway bridge in eastern China that dramatically shortens travel time between Shanghai and Ningbo across Hangzhou Bay.
-
D.
Hong Kong–Zhuhai–Macau Bridge
The Hong Kong–Zhuhai–Macau Bridge is a massive sea-crossing bridge–tunnel system that links Hong Kong, Zhuhai, and Macau across the Pearl River Delta and ranks among the world’s longest fixed links over water.
-
E.
Shenzhen Bay Bridge
Shenzhen Bay Bridge is a cross-border sea bridge linking mainland China and Hong Kong across Shenzhen Bay, serving as a major transportation corridor in the Pearl River Delta region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Qingdao Jiaozhou Bay Tunnel Target entity description: The Qingdao Jiaozhou Bay Tunnel is a major undersea road tunnel in Qingdao, China, that provides a direct transportation link beneath Jiaozhou Bay, significantly shortening travel time between the city’s urban districts and its outlying areas.
-
A.
Jiaozhou Bay Bridge
Jiaozhou Bay Bridge is a long sea-crossing bridge in eastern China that carries traffic across Jiaozhou Bay near Qingdao.
-
B.
Pingtan Strait Road-Rail Bridge
The Pingtan Strait Road-Rail Bridge is a major sea-crossing bridge in Fujian, China, carrying both highway and railway lines to connect Pingtan Island with the mainland.
-
C.
Hangzhou Bay Bridge
The Hangzhou Bay Bridge is a long trans-oceanic highway bridge in eastern China that dramatically shortens travel time between Shanghai and Ningbo across Hangzhou Bay.
-
D.
Hong Kong–Zhuhai–Macau Bridge
The Hong Kong–Zhuhai–Macau Bridge is a massive sea-crossing bridge–tunnel system that links Hong Kong, Zhuhai, and Macau across the Pearl River Delta and ranks among the world’s longest fixed links over water.
-
E.
Shenzhen Bay Bridge
Shenzhen Bay Bridge is a cross-border sea bridge linking mainland China and Hong Kong across Shenzhen Bay, serving as a major transportation corridor in the Pearl River Delta region.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2454b3a5881909c64773dc8a5d289 |
completed | April 17, 2026, 2:35 p.m. |
| NER | Named-entity recognition | batch_69f1a5124a54819087a7ae2f8a5b3dc0 |
completed | April 29, 2026, 6:28 a.m. |
Created at: April 17, 2026, 5:39 p.m.