Triple

T2340577
Position Surface form Disambiguated ID Type / Status
Subject Eder Dam E45015 entity
Predicate hasNameInGerman P22792 FINISHED
Object Edertalsperre E45015 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Edertalsperre | Statement: [Eder Dam, hasNameInGerman, Edertalsperre]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Edertalsperre
Context triple: [Eder Dam, hasNameInGerman, Edertalsperre]
  • A. Sorpe Dam
    The Sorpe Dam is a German earth-fill dam in the Ruhr region that was a key target of the RAF’s World War II “Dambusters” raid, Operation Chastise.
  • B. Eder Dam chosen
    Eder Dam is a major German gravity dam in the Eder River valley, historically known for being one of the dams breached by the RAF’s “Dambusters” raid during World War II.
  • C. Lahontan Dam
    Lahontan Dam is a large early-20th-century concrete gravity dam in western Nevada that creates Lahontan Reservoir for irrigation, flood control, and recreation.
  • D. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • E. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88917935081909b755dbf38e81024 completed March 4, 2026, 7:33 p.m.
NER Named-entity recognition batch_69abc6abf1688190b7c404de0979149a completed March 7, 2026, 6:33 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae961fd8748190a82ca4c4b840d9f6 completed March 9, 2026, 9:42 a.m.
Created at: March 4, 2026, 7:52 p.m.