Triple

T23397928
Position Surface form Disambiguated ID Type / Status
Subject Stirling and Gowan E559414 entity
Predicate notableWork P4 FINISHED
Object Hambledeon Crescent (unbuilt schemes and housing studies) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hambledeon Crescent (unbuilt schemes and housing studies) | Statement: [Stirling and Gowan, notableWork, Hambledeon Crescent (unbuilt schemes and housing studies)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hambledeon Crescent (unbuilt schemes and housing studies)
Context triple: [Stirling and Gowan, notableWork, Hambledeon Crescent (unbuilt schemes and housing studies)]
  • A. Harlow New Town master plan
    The Harlow New Town master plan is a pioneering post-war British urban design scheme that laid out the modernist, green, and socially planned development of the new town of Harlow in Essex.
  • B. London Plan
    The London Plan is the Mayor of London’s strategic spatial development framework that guides long-term planning, growth, and land use across Greater London.
  • C. County of London Plan
    The County of London Plan was a landmark mid-20th-century urban planning blueprint that proposed the comprehensive redevelopment and modernization of London, particularly in the aftermath of World War II.
  • D. Greenbelt Plan
    The Greenbelt Plan is a provincial land-use policy in Ontario that protects a broad band of farmland, forests, wetlands, and watersheds from urban sprawl and incompatible development.
  • E. Greater London Plan 1944
    Greater London Plan 1944 was a landmark post-war urban planning blueprint that proposed the reorganization, decentralization, and green belt protection of London and its surrounding region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Hambledeon Crescent (unbuilt schemes and housing studies)
Target entity description: Hambledeon Crescent (unbuilt schemes and housing studies) is an unrealized residential project by the architectural partnership Stirling and Gowan, known for its experimental exploration of housing form and urban layout.
  • A. Harlow New Town master plan
    The Harlow New Town master plan is a pioneering post-war British urban design scheme that laid out the modernist, green, and socially planned development of the new town of Harlow in Essex.
  • B. London Plan
    The London Plan is the Mayor of London’s strategic spatial development framework that guides long-term planning, growth, and land use across Greater London.
  • C. County of London Plan
    The County of London Plan was a landmark mid-20th-century urban planning blueprint that proposed the comprehensive redevelopment and modernization of London, particularly in the aftermath of World War II.
  • D. Greenbelt Plan
    The Greenbelt Plan is a provincial land-use policy in Ontario that protects a broad band of farmland, forests, wetlands, and watersheds from urban sprawl and incompatible development.
  • E. Greater London Plan 1944
    Greater London Plan 1944 was a landmark post-war urban planning blueprint that proposed the reorganization, decentralization, and green belt protection of London and its surrounding region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24549610c8190a069d6411ce5f661 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f1a4dd05cc81908c1e91974ffccf21 completed April 29, 2026, 6:27 a.m.
Created at: April 17, 2026, 5:37 p.m.