Triple

T23364209
Position Surface form Disambiguated ID Type / Status
Subject State Capture Inquiry E593266 entity
Predicate investigated P6157 FINISHED
Object Eskom NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eskom | Statement: [State Capture Inquiry, investigated, Eskom]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eskom
Context triple: [State Capture Inquiry, investigated, Eskom]
  • A. Electricity Supply Commission of South Africa chosen
    The Electricity Supply Commission of South Africa, commonly known as Eskom, is the state-owned utility responsible for generating, transmitting, and distributing the majority of South Africa’s electrical power.
  • B. Zimbabwe Power Company
    Zimbabwe Power Company is the state-owned utility responsible for generating electricity in Zimbabwe, operating major power stations including the Kariba hydroelectric facilities.
  • C. Kriel Power Station
    Kriel Power Station is a large coal-fired power plant in South Africa that forms part of the country’s major electricity-generating infrastructure.
  • D. Matla Power Station
    Matla Power Station is a large coal-fired power plant in South Africa that is a major contributor to the country’s electricity generation.
  • E. Matimba Power Station
    Matimba Power Station is a large coal-fired power plant in South Africa and one of the key facilities in the country’s electricity generation network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d2593c88190bcdf4a716a94ccb2 completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f1a0aac4248190a4663ed12aed6856 completed April 29, 2026, 6:09 a.m.
Created at: April 17, 2026, 5:31 p.m.