Triple

T23359087
Position Surface form Disambiguated ID Type / Status
Subject Arlberg Pass E593133 entity
Predicate hasStructure P35 FINISHED
Object Arlberg Railway Tunnel NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Arlberg Railway Tunnel | Statement: [Arlberg Pass, hasStructure, Arlberg Railway Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Arlberg Railway Tunnel
Context triple: [Arlberg Pass, hasStructure, Arlberg Railway Tunnel]
  • A. Gotthard Road Tunnel
    The Gotthard Road Tunnel is a major Swiss Alpine tunnel and one of Europe’s key north–south road links, carrying traffic beneath the Saint-Gotthard Massif.
  • B. Gotthard Base Tunnel
    The Gotthard Base Tunnel is a 57-kilometer railway tunnel beneath the Swiss Alps, renowned as one of the world’s longest and deepest traffic tunnels, designed to improve high-speed rail connectivity across Europe.
  • C. Furka Base Tunnel
    The Furka Base Tunnel is a long railway tunnel in the Swiss Alps that provides an all-weather, low-level route beneath the Furka Pass, improving connectivity and reliability on the Matterhorn Gotthard Bahn line.
  • D. Albula Tunnel
    The Albula Tunnel is a historic Swiss railway tunnel in the Alps, renowned for its engineering significance and role in the UNESCO-listed Albula/Bernina railway line.
  • E. Jungfrau Railway tunnel
    The Jungfrau Railway tunnel is a high-altitude railway passage through the Eiger in the Swiss Alps that carries trains up to the Jungfraujoch, often called the "Top of Europe."
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Arlberg Railway Tunnel
Target entity description: The Arlberg Railway Tunnel is a major Alpine rail tunnel in Austria that carries trains beneath the Arlberg massif, providing a key east–west transit route through the mountains.
  • A. Gotthard Road Tunnel
    The Gotthard Road Tunnel is a major Swiss Alpine tunnel and one of Europe’s key north–south road links, carrying traffic beneath the Saint-Gotthard Massif.
  • B. Gotthard Base Tunnel
    The Gotthard Base Tunnel is a 57-kilometer railway tunnel beneath the Swiss Alps, renowned as one of the world’s longest and deepest traffic tunnels, designed to improve high-speed rail connectivity across Europe.
  • C. Furka Base Tunnel
    The Furka Base Tunnel is a long railway tunnel in the Swiss Alps that provides an all-weather, low-level route beneath the Furka Pass, improving connectivity and reliability on the Matterhorn Gotthard Bahn line.
  • D. Albula Tunnel
    The Albula Tunnel is a historic Swiss railway tunnel in the Alps, renowned for its engineering significance and role in the UNESCO-listed Albula/Bernina railway line.
  • E. Jungfrau Railway tunnel
    The Jungfrau Railway tunnel is a high-altitude railway passage through the Eiger in the Swiss Alps that carries trains up to the Jungfraujoch, often called the "Top of Europe."
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d24d2a4819092e6ede74c2a918d completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f19a1a39988190b4b4993b80d5a5f6 completed April 29, 2026, 5:41 a.m.
Created at: April 17, 2026, 5:29 p.m.