Triple
T23356199
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Acropolis summit |
E593057
|
entity |
| Predicate | majorConstructionCentury |
P6333
|
FINISHED |
| Object | 5th century BCE |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 5th century BCE | Statement: [Acropolis summit, majorConstructionCentury, 5th century BCE]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: majorConstructionCentury Context triple: [Acropolis summit, majorConstructionCentury, 5th century BCE]
-
A.
constructionCentury
chosen
Indicates the century during which something was constructed or built.
-
B.
eraOfMajorConstruction
Indicates the time period during which the primary or most significant phase of construction for an entity took place.
-
C.
majorConstruction
Indicates a relationship where a construction project is large-scale, significant, or of primary importance in scope, impact, or resources.
-
D.
estimatedConstructionEndCentury
Indicates the century in which the construction of something is estimated to have been completed.
-
E.
buildingsDemolishedInCentury
Indicates that the referenced buildings were demolished during the specified century.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d24d2a4819092e6ede74c2a918d |
completed | April 17, 2026, 4:17 p.m. |
| NER | Named-entity recognition | batch_69f19a176b548190bf5a08bb2585344d |
completed | April 29, 2026, 5:41 a.m. |
| PD | Predicate disambiguation | batch_69effcfd8d288190937a887fe6023c11 |
completed | April 28, 2026, 12:19 a.m. |
Created at: April 17, 2026, 5:27 p.m.