Triple

T23291836
Position Surface form Disambiguated ID Type / Status
Subject Hamlet, North Carolina E590052 entity
Predicate hasHighway P385 FINISHED
Object North Carolina Highway 177 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North Carolina Highway 177 | Statement: [Hamlet, North Carolina, hasHighway, North Carolina Highway 177]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North Carolina Highway 177
Context triple: [Hamlet, North Carolina, hasHighway, North Carolina Highway 177]
  • A. North Carolina Highway 168
    North Carolina Highway 168 is a primary state highway in northeastern North Carolina that serves as a key route connecting the Hampton Roads region of Virginia with the Outer Banks.
  • B. North Carolina Highway 211
    North Carolina Highway 211 is a primary state highway in North Carolina that runs across the south-central and southeastern part of the state, connecting inland communities with coastal areas.
  • C. North Carolina Highway 217
    North Carolina Highway 217 is a primary state highway in North Carolina that connects the town of Erwin to nearby communities and regional routes.
  • D. North Carolina Highway 119
    North Carolina Highway 119 is a state highway in North Carolina that serves as a regional connector route through communities including Mebane.
  • E. North Carolina Highway 103
    North Carolina Highway 103 is a state highway in North Carolina that serves as a primary route connecting the city of Mount Airy to rural areas in Surry County and toward the Virginia state line.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: North Carolina Highway 177
Target entity description: North Carolina Highway 177 is a primary state highway in southern North Carolina that connects the town of Hamlet to the South Carolina state line.
  • A. North Carolina Highway 168
    North Carolina Highway 168 is a primary state highway in northeastern North Carolina that serves as a key route connecting the Hampton Roads region of Virginia with the Outer Banks.
  • B. North Carolina Highway 211
    North Carolina Highway 211 is a primary state highway in North Carolina that runs across the south-central and southeastern part of the state, connecting inland communities with coastal areas.
  • C. North Carolina Highway 217
    North Carolina Highway 217 is a primary state highway in North Carolina that connects the town of Erwin to nearby communities and regional routes.
  • D. North Carolina Highway 119
    North Carolina Highway 119 is a state highway in North Carolina that serves as a regional connector route through communities including Mebane.
  • E. North Carolina Highway 103
    North Carolina Highway 103 is a state highway in North Carolina that serves as a primary route connecting the city of Mount Airy to rural areas in Surry County and toward the Virginia state line.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d1af9d88190a0b9b5e8fa608618 completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f196cc20c08190a6a678befe1061dd completed April 29, 2026, 5:27 a.m.
Created at: April 17, 2026, 5:02 p.m.