Triple
T2327341
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Route 1/9 |
E48318
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | concurrent U.S. Highway |
C9637
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: concurrent U.S. Highway Context triple: [U.S. Route 1/9, instanceOf, concurrent U.S. Highway]
-
A.
Interstate Highway
An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
-
B.
United States federal road
A United States federal road is a roadway that is part of the national highway system and is funded, regulated, or maintained in whole or in part by the federal government to support interstate travel, commerce, and defense.
-
C.
U.S. Numbered Highway
chosen
A U.S. Numbered Highway is a nationally coordinated, signed roadway within the United States that is part of the United States Numbered Highway System, providing intercity and interstate connections but distinct from the Interstate Highway System.
-
D.
auxiliary Interstate Highway
An auxiliary Interstate Highway is a shorter, supplementary route connected to a primary Interstate that typically serves to bypass, loop around, or provide direct access to urban areas.
-
E.
highway
A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88aa308a88190b0b86c011fda7fce |
completed | March 4, 2026, 7:40 p.m. |
Created at: March 4, 2026, 7:50 p.m.