Triple
T23247176
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Clinton County, Indiana |
E581611
|
entity |
| Predicate | roadNetworkFeature |
P3293
|
FINISHED |
| Object | served by U.S. Route 421 |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: served by U.S. Route 421 | Statement: [Clinton County, Indiana, roadNetworkFeature, served by U.S. Route 421]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: served by U.S. Route 421 Context triple: [Clinton County, Indiana, roadNetworkFeature, served by U.S. Route 421]
-
A.
served by U.S. Route 24
U.S. Route 24 is a major east–west United States highway that runs through several Midwestern and Mountain states, providing an important regional transportation corridor.
-
B.
served by U.S. Route 412
Kennett, Missouri is a small city in the Missouri Bootheel region that serves as a local commercial and agricultural hub near the Arkansas border.
-
C.
served by U.S. Route 20
U.S. Route 20 is a major east–west U.S. highway that spans the country from the Pacific Northwest to New England, connecting numerous cities and regions across its extensive route.
-
D.
served by U.S. Route 460
Served by U.S. Route 460 is a transportation designation indicating that the city of Mt. Sterling, Kentucky, is accessible via the U.S. Route 460 highway.
-
E.
served by U.S. Route 29
Newnan, Georgia is a city in Coweta County within the Atlanta metropolitan area, known for its historic downtown and role as a regional commercial and residential hub.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: served by U.S. Route 421 Target entity description: U.S. Route 421 is a major north–south United States highway that runs through several states in the eastern and central U.S., connecting numerous rural areas, small towns, and regional centers.
-
A.
served by U.S. Route 24
U.S. Route 24 is a major east–west United States highway that runs through several Midwestern and Mountain states, providing an important regional transportation corridor.
-
B.
served by U.S. Route 412
Kennett, Missouri is a small city in the Missouri Bootheel region that serves as a local commercial and agricultural hub near the Arkansas border.
-
C.
served by U.S. Route 20
U.S. Route 20 is a major east–west U.S. highway that spans the country from the Pacific Northwest to New England, connecting numerous cities and regions across its extensive route.
-
D.
served by U.S. Route 460
Served by U.S. Route 460 is a transportation designation indicating that the city of Mt. Sterling, Kentucky, is accessible via the U.S. Route 460 highway.
-
E.
served by U.S. Route 29
Newnan, Georgia is a city in Coweta County within the Atlanta metropolitan area, known for its historic downtown and role as a regional commercial and residential hub.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24606b17c81908aba1a4911c8a8ba |
completed | April 17, 2026, 2:39 p.m. |
| NER | Named-entity recognition | batch_69f193f1e8448190b8420a8dc6e24576 |
completed | April 29, 2026, 5:15 a.m. |
Created at: April 17, 2026, 4:10 p.m.