Triple

T23220100
Position Surface form Disambiguated ID Type / Status
Subject Allen Expressway E580862 entity
Predicate constructionCancelled P32859 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Allen Expressway, constructionCancelled, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionCancelled
Context triple: [Allen Expressway, constructionCancelled, true]
  • A. constructionHalted chosen
    Indicates that an ongoing construction activity or project has been stopped or suspended before completion.
  • B. constructionProgressAtCancellation
    Indicates the level or stage of construction that had been reached at the time the project or contract was cancelled.
  • C. constructionInterruptedBy
    Indicates that an ongoing construction process is halted, delayed, or disrupted due to the actions or occurrence of another specified entity or event.
  • D. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • E. constructionResumed
    Indicates that previously halted construction activity on an entity or project has started again.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2460389408190be74f41d217799a9 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f1916870148190853874e6cf26bbc7 completed April 29, 2026, 5:04 a.m.
PD Predicate disambiguation batch_69effcccee508190a7ae311fdd319806 completed April 28, 2026, 12:18 a.m.
Created at: April 17, 2026, 4:08 p.m.