Triple

T23217062
Position Surface form Disambiguated ID Type / Status
Subject Marshall, Missouri E580774 entity
Predicate transportInfrastructure P1777 FINISHED
Object Missouri Route 240 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Missouri Route 240 | Statement: [Marshall, Missouri, transportInfrastructure, Missouri Route 240]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Missouri Route 240
Context triple: [Marshall, Missouri, transportInfrastructure, Missouri Route 240]
  • A. Missouri Route 248
    Missouri Route 248 is a state highway in Missouri that runs through the Ozarks region, serving communities in and around Stone County and connecting to several major routes in southwest Missouri.
  • B. Missouri Route 249
    Missouri Route 249 is a short state highway in southwestern Missouri that serves as a connector route near Joplin, linking local traffic to major regional roadways.
  • C. Missouri Route 242
    Missouri Route 242 is a short state highway in central Missouri that connects key routes near Lake of the Ozarks, improving access to the Lake Ozark area and surrounding developments.
  • D. Missouri Route 224
    Missouri Route 224 is a state highway in western Missouri that runs along the Missouri River, serving communities such as Lexington and connecting local traffic to larger regional routes.
  • E. Missouri Route 24
    Missouri Route 24 is a major east–west state highway in Missouri that connects numerous central and western communities, including Keytesville, and serves as an important regional transportation corridor.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Missouri Route 240
Target entity description: Missouri Route 240 is a state highway in central Missouri that connects several communities, including Marshall, and provides regional access across the area.
  • A. Missouri Route 248
    Missouri Route 248 is a state highway in Missouri that runs through the Ozarks region, serving communities in and around Stone County and connecting to several major routes in southwest Missouri.
  • B. Missouri Route 249
    Missouri Route 249 is a short state highway in southwestern Missouri that serves as a connector route near Joplin, linking local traffic to major regional roadways.
  • C. Missouri Route 242
    Missouri Route 242 is a short state highway in central Missouri that connects key routes near Lake of the Ozarks, improving access to the Lake Ozark area and surrounding developments.
  • D. Missouri Route 224
    Missouri Route 224 is a state highway in western Missouri that runs along the Missouri River, serving communities such as Lexington and connecting local traffic to larger regional routes.
  • E. Missouri Route 24
    Missouri Route 24 is a major east–west state highway in Missouri that connects numerous central and western communities, including Keytesville, and serves as an important regional transportation corridor.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2460389408190be74f41d217799a9 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f19165949c81908e4d66a8a2b0a25a completed April 29, 2026, 5:04 a.m.
Created at: April 17, 2026, 4:08 p.m.