Triple
T23204994
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ontario Highway 94 |
E580426
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | secondary highway |
C264
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: secondary highway Context triple: [Ontario Highway 94, instanceOf, secondary highway]
-
A.
highway
A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
-
B.
auxiliary Interstate Highway
An auxiliary Interstate Highway is a shorter, supplementary route connected to a primary Interstate that typically serves to bypass, loop around, or provide direct access to urban areas.
-
C.
motorway
A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
-
D.
named highway
A named highway is a designated road or route identified by a specific name or number, used for navigation, transportation, and geographic reference within a roadway network.
-
E.
state highway
chosen
A state highway is a public road maintained and administered by a state government, forming part of a regional or statewide transportation network that connects cities, towns, and other major routes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24602ae1481908aaa6bc7ca493867 |
completed | April 17, 2026, 2:38 p.m. |
Created at: April 17, 2026, 4:07 p.m.