Triple

T23203261
Position Surface form Disambiguated ID Type / Status
Subject Tú alfagra land mítt E580375 entity
Predicate instanceOf P0 FINISHED
Object cultural work C47389 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cultural work
Context triple: [Tú alfagra land mítt, instanceOf, cultural work]
  • A. cultural policy
    Cultural policy is the set of principles, decisions, and actions through which governments and institutions shape the production, distribution, access to, and preservation of cultural expressions and heritage.
  • B. cultural review
    A cultural review is a critical evaluation and interpretation of artistic, social, or cultural works or events, examining their meaning, context, and impact on society.
  • C. cultural category
    A cultural category is a socially constructed grouping that organizes people, practices, objects, or ideas according to shared meanings, values, and norms within a particular culture.
  • D. cultural industry
    A cultural industry is an economic sector that produces, distributes, and commercializes cultural goods and services—such as film, music, publishing, and the arts—shaping social values and identities while generating financial value.
  • E. culture
    Culture is the shared system of values, beliefs, practices, symbols, and artifacts that shapes how a group of people understand and interact with the world and with each other.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24602ae1481908aaa6bc7ca493867 completed April 17, 2026, 2:38 p.m.
Created at: April 17, 2026, 4:07 p.m.