Triple

T2320176
Position Surface form Disambiguated ID Type / Status
Subject President George Bush Turnpike E51161 entity
Predicate hasJunctionWith P1018 FINISHED
Object Interstate 635 E220372 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 635 | Statement: [President George Bush Turnpike, hasJunctionWith, Interstate 635]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 635
Context triple: [President George Bush Turnpike, hasJunctionWith, Interstate 635]
  • A. Interstate 635 chosen
    Interstate 635 is a major beltway and commuter freeway serving the Dallas–Fort Worth metropolitan area in Texas.
  • B. Interstate 635
    Interstate 635 is a short auxiliary Interstate Highway in the Kansas City metropolitan area that serves as a bypass and connector route between Kansas and Missouri.
  • C. Interstate 630
    Interstate 630 is an east–west auxiliary Interstate Highway serving as a major commuter route through Little Rock, Arkansas.
  • D. Interstate 675
    Interstate 675 is a short auxiliary interstate highway in the Atlanta metropolitan area that connects Interstate 75 in Henry County to Interstate 285 in DeKalb County, serving as a bypass route southeast of downtown Atlanta.
  • E. Interstate 610
    Interstate 610 is a beltway freeway encircling central Houston, Texas, serving as a major loop that connects multiple radial highways and facilitates regional traffic flow.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b074b908190ae983dbca7757d88 completed March 4, 2026, 7:41 p.m.
NER Named-entity recognition batch_69abc632474c8190972b4611a3a4ff8f completed March 7, 2026, 6:31 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2571ac8ec8190bf59c2cec5e2e6e2 completed April 5, 2026, 12:35 p.m.
Created at: March 4, 2026, 7:49 p.m.