Triple
T23155358
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Scaled Agile Framework |
E578421
|
entity |
| Predicate | keyConcept |
P531
|
FINISHED |
| Object | Solution Train |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Solution Train | Statement: [Scaled Agile Framework, keyConcept, Solution Train]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Solution Train Context triple: [Scaled Agile Framework, keyConcept, Solution Train]
-
A.
Train 4
Train 4 is an additional liquefied natural gas production unit at the Yamal LNG project in Russia, designed to expand the facility’s overall LNG output capacity.
-
B.
LINK Train system
The LINK Train system is an automated people-mover service at Toronto Pearson International Airport that transports passengers between terminals and nearby facilities.
-
C.
Outbound Train
Outbound Train is a track from the band Prisoner, likely reflecting their characteristic style and themes within their musical catalog.
-
D.
CTrain
CTrain is Calgary’s light rail transit system that serves as the backbone of the city’s public transportation network.
-
E.
Train 7
Train 7 is a planned liquefied natural gas production unit that will expand the processing capacity of the Nigeria LNG facility on Bonny Island.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Solution Train Target entity description: A Solution Train is a Scaled Agile Framework construct that coordinates multiple Agile Release Trains and suppliers to deliver large, complex solutions in a synchronized, value-focused way.
-
A.
Train 4
Train 4 is an additional liquefied natural gas production unit at the Yamal LNG project in Russia, designed to expand the facility’s overall LNG output capacity.
-
B.
LINK Train system
The LINK Train system is an automated people-mover service at Toronto Pearson International Airport that transports passengers between terminals and nearby facilities.
-
C.
Outbound Train
Outbound Train is a track from the band Prisoner, likely reflecting their characteristic style and themes within their musical catalog.
-
D.
CTrain
CTrain is Calgary’s light rail transit system that serves as the backbone of the city’s public transportation network.
-
E.
Train 7
Train 7 is a planned liquefied natural gas production unit that will expand the processing capacity of the Nigeria LNG facility on Bonny Island.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245fb8de081908f0eba7b5fd75bc4 |
completed | April 17, 2026, 2:38 p.m. |
| NER | Named-entity recognition | batch_69f18efca1f081908ff1c34ba25f40c3 |
completed | April 29, 2026, 4:54 a.m. |
Created at: April 17, 2026, 4:01 p.m.