Triple
T23120336
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Spherical Torus Experiment |
E576874
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | spherical tokamak |
C47253
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: spherical tokamak Context triple: [National Spherical Torus Experiment, instanceOf, spherical tokamak]
-
A.
stellarator
A stellarator is a type of nuclear fusion device that uses complex, twisted magnetic fields generated by external coils to confine hot plasma in a stable, continuous toroidal configuration.
-
B.
fusion energy research facility
A fusion energy research facility is a specialized scientific complex where researchers design, build, and operate advanced experimental systems to achieve and study controlled nuclear fusion as a potential source of large-scale, low-carbon power.
-
C.
circular particle accelerator
A circular particle accelerator is a device that uses magnetic fields to guide charged particles around a closed loop while electric fields repeatedly increase their energy for high-speed collisions or experiments.
-
D.
tritium production reactor
A tritium production reactor is a specialized nuclear reactor designed and operated to generate tritium, typically by irradiating lithium-bearing materials with neutrons.
-
E.
spiral
A spiral is a curve that winds around a central point or axis while progressively moving farther from or closer to it.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245f6c2e881909a228fdcfeb7c7d3 |
completed | April 17, 2026, 2:38 p.m. |
Created at: April 17, 2026, 3:59 p.m.