Triple
T2310487
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nova 1 |
E51944
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | train subfleet |
C912
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: train subfleet Context triple: [Nova 1, instanceOf, train subfleet]
-
A.
training ship
A training ship is a vessel specifically equipped and operated to provide practical seamanship and maritime education to cadets and trainees at sea.
-
B.
auto ferry train
An auto ferry train is a specialized rail service designed to transport passengers along with their vehicles—such as cars, motorcycles, and small trucks—across long distances or through otherwise impassable routes like tunnels or mountainous regions.
-
C.
sealift fleet
A sealift fleet is a collection of cargo and support vessels organized to transport military or commercial goods and equipment across seas and oceans.
-
D.
rail transit
chosen
Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
-
E.
rapid transit division
A rapid transit division is an organizational unit within a transportation agency responsible for planning, operating, and maintaining high-frequency, high-capacity urban rail or bus rapid transit services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88b0bb30c81908ded03b006d29387 |
completed | March 4, 2026, 7:42 p.m. |
Created at: March 4, 2026, 7:49 p.m.