Triple

T2310025
Position Surface form Disambiguated ID Type / Status
Subject Bramley-Moore Dock stadium development E51932 entity
Predicate instanceOf P0 FINISHED
Object Everton F.C. stadium project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Everton F.C. stadium project
Context triple: [Bramley-Moore Dock stadium development, instanceOf, Everton F.C. stadium project]
  • A. defunct stadium
    A defunct stadium is a former sports or event venue that has been permanently closed, demolished, or repurposed so it no longer functions in its original capacity.
  • B. stadium authority
    A stadium authority is an organization, typically public or quasi-public, responsible for owning, managing, financing, and overseeing the operation and development of a sports or entertainment stadium and its surrounding facilities.
  • C. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • D. Newport mansion
    A Newport mansion is a grand, historically significant seaside estate in Newport, Rhode Island, known for its opulent architecture, lavish interiors, and association with America’s Gilded Age elite.
  • E. AeroTrain station
    An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b0bb30c81908ded03b006d29387 completed March 4, 2026, 7:42 p.m.
Created at: March 4, 2026, 7:49 p.m.