Triple

T2310024
Position Surface form Disambiguated ID Type / Status
Subject Bramley-Moore Dock stadium development E51932 entity
Predicate instanceOf P0 FINISHED
Object sports venue construction project C6940 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: sports venue construction project
Context triple: [Bramley-Moore Dock stadium development, instanceOf, sports venue construction project]
  • A. sports venue
    A sports venue is a designated facility or location equipped to host organized athletic events, competitions, and related spectator activities.
  • B. sports venue feature
    A sports venue feature is a distinct physical or functional element within a sports facility—such as seating areas, scoreboards, playing surfaces, or lighting systems—that supports or enhances the hosting and viewing of sporting events.
  • C. sports facilities planning project chosen
    A sports facilities planning project is a coordinated effort to assess needs, design, and strategically develop or upgrade sports venues and related infrastructure to optimally serve users and communities.
  • D. sports venue collection
    A sports venue collection is an organized set of multiple sports facilities or stadiums, grouped for purposes such as management, analysis, comparison, or presentation.
  • E. sports venue usage
    Sports venue usage represents the scheduling, allocation, and occupancy of a sports facility by various events, teams, or activities over time.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b0bb30c81908ded03b006d29387 completed March 4, 2026, 7:42 p.m.
Created at: March 4, 2026, 7:49 p.m.