Triple
T23080296
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Northern Xinjiang railway |
E575449
|
entity |
| Predicate | borderCrossing |
P4105
|
FINISHED |
| Object | Alashankou border crossing |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Alashankou border crossing | Statement: [Northern Xinjiang railway, borderCrossing, Alashankou border crossing]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Alashankou border crossing Context triple: [Northern Xinjiang railway, borderCrossing, Alashankou border crossing]
-
A.
Lweje–Zhangfeng border crossing
The Lweje–Zhangfeng border crossing is a key land checkpoint and trade gateway linking northern Myanmar with China’s Yunnan province.
-
B.
Tatopani–Zhangmu border crossing
The Tatopani–Zhangmu border crossing is a key trans-Himalayan trade and transit point linking Nepal and China, historically serving as one of the busiest overland routes between the two countries.
-
C.
Lao Bao International Border Gate
Lao Bao International Border Gate is a major land border crossing between Vietnam and Laos, serving as an important hub for trade and transportation in central Vietnam.
-
D.
Kanpiketi–Yingjiang border crossing
The Kanpiketi–Yingjiang border crossing is a key land checkpoint facilitating trade and travel between northern Myanmar and China’s Yunnan Province.
-
E.
Suifenhe–Pogranichny crossing
The Suifenhe–Pogranichny crossing is a major rail and road border checkpoint between Russia and China that serves as an important hub for bilateral trade and transportation.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Alashankou border crossing Target entity description: Alashankou border crossing is a major rail and road gateway between China and Kazakhstan in Xinjiang, serving as a key hub for trans-Eurasian trade and freight transport.
-
A.
Lweje–Zhangfeng border crossing
The Lweje–Zhangfeng border crossing is a key land checkpoint and trade gateway linking northern Myanmar with China’s Yunnan province.
-
B.
Tatopani–Zhangmu border crossing
The Tatopani–Zhangmu border crossing is a key trans-Himalayan trade and transit point linking Nepal and China, historically serving as one of the busiest overland routes between the two countries.
-
C.
Lao Bao International Border Gate
Lao Bao International Border Gate is a major land border crossing between Vietnam and Laos, serving as an important hub for trade and transportation in central Vietnam.
-
D.
Kanpiketi–Yingjiang border crossing
The Kanpiketi–Yingjiang border crossing is a key land checkpoint facilitating trade and travel between northern Myanmar and China’s Yunnan Province.
-
E.
Suifenhe–Pogranichny crossing
The Suifenhe–Pogranichny crossing is a major rail and road border checkpoint between Russia and China that serves as an important hub for bilateral trade and transportation.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245be28d48190ad1348d5a73db37d |
completed | April 17, 2026, 2:37 p.m. |
| NER | Named-entity recognition | batch_69f18c66a80481909ebc2ba69f1e4bd9 |
completed | April 29, 2026, 4:43 a.m. |
Created at: April 17, 2026, 3:56 p.m.