Triple

T23079587
Position Surface form Disambiguated ID Type / Status
Subject CSS Georgia E575430 entity
Predicate builder P3143 FINISHED
Object Savannah shipyard NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Savannah shipyard | Statement: [CSS Georgia, builder, Savannah shipyard]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Savannah shipyard
Context triple: [CSS Georgia, builder, Savannah shipyard]
  • A. Cramp shipyard
    Cramp shipyard was a prominent American shipbuilding company in Philadelphia known for constructing major naval vessels in the late 19th and early 20th centuries.
  • B. Hartt shipyard
    Hartt shipyard was a prominent 18th-century Boston shipbuilding yard known for constructing major early U.S. naval vessels, including the frigate USS Constitution.
  • C. Crescent Shipyard
    Crescent Shipyard was a prominent late-19th-century American shipbuilding yard in Elizabeth, New Jersey, best known for constructing John Philip Holland’s pioneering submarines for the U.S. Navy.
  • D. Kiel Imperial Shipyard
    Kiel Imperial Shipyard was a major German Imperial Navy shipbuilding facility in Kiel, renowned for constructing early dreadnought battleships and other warships in the late 19th and early 20th centuries.
  • E. Geoje Shipyard
    Geoje Shipyard is one of the world’s largest and most advanced shipbuilding complexes, located on Geoje Island in South Korea and specializing in constructing high-tech vessels and offshore structures.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Savannah shipyard
Target entity description: Savannah shipyard was a Confederate-era shipbuilding facility in Savannah, Georgia, known for constructing the ironclad warship CSS Georgia during the American Civil War.
  • A. Cramp shipyard
    Cramp shipyard was a prominent American shipbuilding company in Philadelphia known for constructing major naval vessels in the late 19th and early 20th centuries.
  • B. Hartt shipyard
    Hartt shipyard was a prominent 18th-century Boston shipbuilding yard known for constructing major early U.S. naval vessels, including the frigate USS Constitution.
  • C. Crescent Shipyard
    Crescent Shipyard was a prominent late-19th-century American shipbuilding yard in Elizabeth, New Jersey, best known for constructing John Philip Holland’s pioneering submarines for the U.S. Navy.
  • D. Kiel Imperial Shipyard
    Kiel Imperial Shipyard was a major German Imperial Navy shipbuilding facility in Kiel, renowned for constructing early dreadnought battleships and other warships in the late 19th and early 20th centuries.
  • E. Geoje Shipyard
    Geoje Shipyard is one of the world’s largest and most advanced shipbuilding complexes, located on Geoje Island in South Korea and specializing in constructing high-tech vessels and offshore structures.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245be28d48190ad1348d5a73db37d completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f18c66a80481909ebc2ba69f1e4bd9 completed April 29, 2026, 4:43 a.m.
Created at: April 17, 2026, 3:56 p.m.