Triple

T23077880
Position Surface form Disambiguated ID Type / Status
Subject Louisiana Public Service Commissioner E575380 entity
Predicate instanceOf P0 FINISHED
Object public utility regulator C12723 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public utility regulator
Context triple: [Louisiana Public Service Commissioner, instanceOf, public utility regulator]
  • A. utility division
    A utility division is an organizational unit within a company responsible for managing and delivering essential support services—such as power, water, communications, or shared infrastructure—to internal or external customers efficiently and reliably.
  • B. regulatory authority
    A regulatory authority is an official body empowered by law to create, implement, and enforce rules and standards within a specific domain to protect public interests and ensure compliance.
  • C. utility mob
    A utility mob is a non-player entity designed primarily to provide functional benefits—such as resources, services, or environmental effects—rather than direct combat or narrative roles.
  • D. public utilities commission chosen
    A public utilities commission is a government regulatory body that oversees and sets standards, rates, and practices for essential public services such as electricity, gas, water, and telecommunications to protect consumers and ensure reliable, fair service.
  • E. engineering regulator
    An engineering regulator is an entity or mechanism that establishes, enforces, and monitors technical standards, safety requirements, and compliance within engineering practices and systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245be28d48190ad1348d5a73db37d completed April 17, 2026, 2:37 p.m.
Created at: April 17, 2026, 3:56 p.m.