Triple

T23075274
Position Surface form Disambiguated ID Type / Status
Subject Sulzer 12LDA28C E575310 entity
Predicate usedIn P98 FINISHED
Object British Rail Class 49 (prototype)
The British Rail Class 49 (prototype) was an experimental diesel-electric locomotive class built for British Railways in the 1960s to trial advanced Sulzer power units and design features.
E1747561 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: British Rail Class 49 (prototype) | Statement: [Sulzer 12LDA28C, usedIn, British Rail Class 49 (prototype)]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: British Rail Class 49 (prototype)
Triple: [Sulzer 12LDA28C, usedIn, British Rail Class 49 (prototype)]
Generated description
The British Rail Class 49 (prototype) was an experimental diesel-electric locomotive class built for British Railways in the 1960s to trial advanced Sulzer power units and design features.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245be28d48190ad1348d5a73db37d completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f18c62c200819099c92654493288ad completed April 29, 2026, 4:43 a.m.
NED1 Entity disambiguation (via context triple) batch_6a121e64ef3081908b39a3c83e4440f3 completed May 23, 2026, 9:38 p.m.
NEDg Description generation batch_6a121fa58ae08190b70faa7e3c81eae8 completed May 23, 2026, 9:44 p.m.
NED2 Entity disambiguation (via description) batch_6a12203ee42c8190be6d4c4d9f0ec859 completed May 23, 2026, 9:46 p.m.
Created at: April 17, 2026, 3:56 p.m.