Triple

T230708
Position Surface form Disambiguated ID Type / Status
Subject Proton Synchrotron E4404 entity
Predicate instanceOf P0 FINISHED
Object CERN accelerator C63 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: CERN accelerator
Context triple: [Proton Synchrotron, instanceOf, CERN accelerator]
  • A. research facility chosen
    A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
  • B. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • C. thermionic valve
    A thermionic valve is an electronic device that controls the flow of electrons in a vacuum or gas-filled tube using heated cathodes and electrodes to amplify, rectify, or switch electrical signals.
  • D. lattice tower
    A lattice tower is a tall, open-framework structure made of intersecting metal or wooden members, designed to support loads such as antennas, power lines, or observation platforms.
  • E. obelisk
    An obelisk is a tall, four-sided, narrow tapering monument that ends in a pyramid-shaped top, typically carved from a single stone and often erected as a commemorative or ceremonial structure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a257363ffc81909757bde7ab3404da completed Feb. 28, 2026, 2:47 a.m.
Created at: Feb. 28, 2026, 2:53 a.m.