Triple
T230708
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Proton Synchrotron |
E4404
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | CERN accelerator |
C63
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: CERN accelerator Context triple: [Proton Synchrotron, instanceOf, CERN accelerator]
-
A.
research facility
chosen
A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
-
B.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
C.
thermionic valve
A thermionic valve is an electronic device that controls the flow of electrons in a vacuum or gas-filled tube using heated cathodes and electrodes to amplify, rectify, or switch electrical signals.
-
D.
lattice tower
A lattice tower is a tall, open-framework structure made of intersecting metal or wooden members, designed to support loads such as antennas, power lines, or observation platforms.
-
E.
obelisk
An obelisk is a tall, four-sided, narrow tapering monument that ends in a pyramid-shaped top, typically carved from a single stone and often erected as a commemorative or ceremonial structure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a257363ffc81909757bde7ab3404da |
completed | Feb. 28, 2026, 2:47 a.m. |
Created at: Feb. 28, 2026, 2:53 a.m.