Triple

T23065973
Position Surface form Disambiguated ID Type / Status
Subject Town of Davidson E575042 entity
Predicate traversedBy P225 FINISHED
Object Interstate 77 (nearby) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 77 (nearby) | Statement: [Town of Davidson, traversedBy, Interstate 77 (nearby)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 77 (nearby)
Context triple: [Town of Davidson, traversedBy, Interstate 77 (nearby)]
  • A. Interstate 26 (nearby)
    Interstate 26 is a major east–west U.S. Interstate Highway in the southeastern United States that connects Tennessee, North Carolina, and South Carolina.
  • B. Interstate 270 (nearby)
    Interstate 270 is a major highway in Maryland that serves as a key commuter and regional route connecting suburban communities to the Washington, D.C. metropolitan area.
  • C. Interstate 376 (nearby)
    Interstate 376 is a major highway in western Pennsylvania that connects the Pittsburgh area with nearby communities and regional routes, providing significant transportation access for places like Neshannock Township.
  • D. Interstate 271 (nearby)
    Interstate 271 is a major auxiliary interstate highway in northeastern Ohio that serves as a bypass around Cleveland and connects several suburbs and regional routes.
  • E. Interstate 75 (nearby)
    Interstate 75 is a major north–south U.S. highway running from Florida to Michigan, serving as a key transportation corridor through the Midwest and Southeast.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 77 (nearby)
Target entity description: Interstate 77 is a major north–south U.S. highway running from Ohio to South Carolina, serving as a key transportation corridor through several states including North Carolina.
  • A. Interstate 26 (nearby)
    Interstate 26 is a major east–west U.S. Interstate Highway in the southeastern United States that connects Tennessee, North Carolina, and South Carolina.
  • B. Interstate 270 (nearby)
    Interstate 270 is a major highway in Maryland that serves as a key commuter and regional route connecting suburban communities to the Washington, D.C. metropolitan area.
  • C. Interstate 376 (nearby)
    Interstate 376 is a major highway in western Pennsylvania that connects the Pittsburgh area with nearby communities and regional routes, providing significant transportation access for places like Neshannock Township.
  • D. Interstate 271 (nearby)
    Interstate 271 is a major auxiliary interstate highway in northeastern Ohio that serves as a bypass around Cleveland and connects several suburbs and regional routes.
  • E. Interstate 75 (nearby)
    Interstate 75 is a major north–south U.S. highway running from Florida to Michigan, serving as a key transportation corridor through the Midwest and Southeast.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245bd6e4c8190bb8942245b68cad5 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f189a3e39481909cad356ad0bb3ee6 completed April 29, 2026, 4:31 a.m.
Created at: April 17, 2026, 3:55 p.m.