Triple

T23065802
Position Surface form Disambiguated ID Type / Status
Subject Wharf District Parks E575037 entity
Predicate createdAsResultOf P972 FINISHED
Object Big Dig project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Big Dig project | Statement: [Wharf District Parks, createdAsResultOf, Big Dig project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Big Dig project
Context triple: [Wharf District Parks, createdAsResultOf, Big Dig project]
  • A. Big Dig
    The Big Dig was a massive and controversial highway and tunnel megaproject in Boston that rerouted traffic underground to replace the city’s elevated Central Artery.
  • B. Central Artery/Tunnel Project chosen
    The Central Artery/Tunnel Project, commonly known as the "Big Dig," was a massive Boston infrastructure megaproject that rerouted the city’s central highway into tunnels to reduce congestion and reclaim urban space.
  • C. Massachusetts Bay Outfall Tunnel
    The Massachusetts Bay Outfall Tunnel is a major deep-rock wastewater discharge tunnel off the coast of Boston that carries treated effluent far offshore to reduce pollution in Boston Harbor and Massachusetts Bay.
  • D. Pittsburgh Project
    The Pittsburgh Project is W. Eugene Smith’s monumental, unfinished photo-essay documenting the city of Pittsburgh through thousands of intensely detailed, black-and-white images.
  • E. MetroWest Water Supply Tunnel system
    The MetroWest Water Supply Tunnel system is a major underground aqueduct in Massachusetts that delivers drinking water from the Quabbin and Wachusett Reservoirs to the Greater Boston area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245bd6e4c8190bb8942245b68cad5 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f189a3e39481909cad356ad0bb3ee6 completed April 29, 2026, 4:31 a.m.
Created at: April 17, 2026, 3:55 p.m.