Triple

T23055426
Position Surface form Disambiguated ID Type / Status
Subject Resende, Rio de Janeiro, Brazil E574141 entity
Predicate hasAutomotivePlant P25392 FINISHED
Object Nissan factory NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nissan factory | Statement: [Resende, Rio de Janeiro, Brazil, hasAutomotivePlant, Nissan factory]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nissan factory
Context triple: [Resende, Rio de Janeiro, Brazil, hasAutomotivePlant, Nissan factory]
  • A. Nissan automotive manufacturing plant
    The Nissan automotive manufacturing plant in Canton, Mississippi is a major vehicle production facility that serves as one of the region’s largest industrial employers and a key hub in Nissan’s North American manufacturing network.
  • B. Nissan Yokohama Plant
    The Nissan Yokohama Plant is a major Nissan manufacturing facility in Yokohama, Japan, renowned for producing high-performance engines such as those used in the Nissan GT-R.
  • C. Nissan Oppama Plant
    Nissan Oppama Plant is a major automotive manufacturing facility of Nissan Motor Co. located in Oppama, Japan, known for producing a wide range of passenger vehicles.
  • D. Nissan Technical Center
    Nissan Technical Center is a major Nissan research and development hub in Japan focused on designing and engineering the company’s vehicles and technologies.
  • E. Nissan Motor Manufacturing UK
    Nissan Motor Manufacturing UK is a major automobile manufacturing plant operated by Nissan in Sunderland, England, and one of the largest car production facilities in the United Kingdom.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Nissan factory
Target entity description: The Nissan factory in Resende, Rio de Janeiro, Brazil is a major automotive manufacturing plant that produces Nissan vehicles for the Brazilian and broader Latin American markets.
  • A. Nissan automotive manufacturing plant
    The Nissan automotive manufacturing plant in Canton, Mississippi is a major vehicle production facility that serves as one of the region’s largest industrial employers and a key hub in Nissan’s North American manufacturing network.
  • B. Nissan Yokohama Plant
    The Nissan Yokohama Plant is a major Nissan manufacturing facility in Yokohama, Japan, renowned for producing high-performance engines such as those used in the Nissan GT-R.
  • C. Nissan Oppama Plant
    Nissan Oppama Plant is a major automotive manufacturing facility of Nissan Motor Co. located in Oppama, Japan, known for producing a wide range of passenger vehicles.
  • D. Nissan Technical Center
    Nissan Technical Center is a major Nissan research and development hub in Japan focused on designing and engineering the company’s vehicles and technologies.
  • E. Nissan Motor Manufacturing UK
    Nissan Motor Manufacturing UK is a major automobile manufacturing plant operated by Nissan in Sunderland, England, and one of the largest car production facilities in the United Kingdom.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245ba7ae48190be606dbc54120e39 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1867f71508190ad4513c6de2453e6 completed April 29, 2026, 4:18 a.m.
Created at: April 17, 2026, 3:54 p.m.