Triple

T22940872
Position Surface form Disambiguated ID Type / Status
Subject Bến Hải River E569723 entity
Predicate hasBridge P386 FINISHED
Object Hiền Lương Bridge NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hiền Lương Bridge | Statement: [Bến Hải River, hasBridge, Hiền Lương Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hiền Lương Bridge
Context triple: [Bến Hải River, hasBridge, Hiền Lương Bridge]
  • A. Hiền Lương Bridge chosen
    Hiền Lương Bridge is a historic bridge over the Bến Hải River in central Vietnam, famously known for marking the division between North and South Vietnam during the Vietnam War.
  • B. Dã Viên Bridge
    Dã Viên Bridge is a notable bridge in Huế, Vietnam, spanning the Perfume River and contributing to the city’s historic riverside landscape.
  • C. Thi Nai Bridge
    Thi Nai Bridge is a major Vietnamese sea-crossing bridge that connects Quy Nhon city to the Phuong Mai Peninsula in Binh Dinh Province.
  • D. Trường Tiền Bridge
    Trường Tiền Bridge is a historic steel bridge spanning the Perfume River in Huế, Vietnam, and is one of the city’s most iconic landmarks.
  • E. Phu My Bridge
    Phu My Bridge is a major cable-stayed bridge in Ho Chi Minh City, Vietnam, that spans the Saigon River and serves as a key transportation link in the city’s southern area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24590862c8190858f180ad302adab completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f181394fec81909da791bb346dbd0a completed April 29, 2026, 3:55 a.m.
Created at: April 17, 2026, 3:45 p.m.