Triple

T22929182
Position Surface form Disambiguated ID Type / Status
Subject U.S. Routes in New Jersey E569387 entity
Predicate hasFormerRoute P102403 FINISHED
Object U.S. Route 206 Alternate in New Jersey NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 206 Alternate in New Jersey | Statement: [U.S. Routes in New Jersey, hasFormerRoute, U.S. Route 206 Alternate in New Jersey]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 206 Alternate in New Jersey
Context triple: [U.S. Routes in New Jersey, hasFormerRoute, U.S. Route 206 Alternate in New Jersey]
  • A. U.S. Route 46 Alternate in New Jersey
    U.S. Route 46 Alternate in New Jersey was a former auxiliary highway that provided an alternate alignment to the main U.S. Route 46 corridor within the state.
  • B. U.S. Route 1 Alternate in New Jersey
    U.S. Route 1 Alternate in New Jersey was a former auxiliary highway that provided an alternate alignment to the main U.S. Route 1 corridor within the state.
  • C. New Jersey Route 33 Alternate
    New Jersey Route 33 Alternate is a former state highway in New Jersey that served as an alternate alignment to the main Route 33, typically routing traffic through more local or urban areas.
  • D. U.S. Route 30 Bypass in New Jersey
    U.S. Route 30 Bypass in New Jersey was a former auxiliary alignment of U.S. Route 30 that diverted through traffic around more congested local sections of the main highway in the state.
  • E. U.S. Route 130 Bypass in New Jersey
    U.S. Route 130 Bypass in New Jersey was a former auxiliary highway that provided an alternate route around portions of the main U.S. Route 130 corridor in the state.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: U.S. Route 206 Alternate in New Jersey
Target entity description: U.S. Route 206 Alternate in New Jersey was a former auxiliary alignment of U.S. Route 206 that provided an alternate path through part of the state before being decommissioned or renumbered.
  • A. U.S. Route 46 Alternate in New Jersey
    U.S. Route 46 Alternate in New Jersey was a former auxiliary highway that provided an alternate alignment to the main U.S. Route 46 corridor within the state.
  • B. U.S. Route 1 Alternate in New Jersey
    U.S. Route 1 Alternate in New Jersey was a former auxiliary highway that provided an alternate alignment to the main U.S. Route 1 corridor within the state.
  • C. New Jersey Route 33 Alternate
    New Jersey Route 33 Alternate is a former state highway in New Jersey that served as an alternate alignment to the main Route 33, typically routing traffic through more local or urban areas.
  • D. U.S. Route 30 Bypass in New Jersey
    U.S. Route 30 Bypass in New Jersey was a former auxiliary alignment of U.S. Route 30 that diverted through traffic around more congested local sections of the main highway in the state.
  • E. U.S. Route 130 Bypass in New Jersey
    U.S. Route 130 Bypass in New Jersey was a former auxiliary highway that provided an alternate route around portions of the main U.S. Route 130 corridor in the state.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458f7d008190901dccbaebeaba24 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f180dc33e8819099e5ad87207de57f completed April 29, 2026, 3:54 a.m.
Created at: April 17, 2026, 3:44 p.m.